Trident has been one of the leading industries in sustainable manufacturing for over three decades. Starting with Wheat-Straw Paper, the Company has now announced that it has completed Solar Power Project of 8.87 MWp at Budhni, Madhya Pradesh out of which commissioning of 5.48 MWp Solar Power Plant (Phase I) for captive use has been successfully completed and the remaining 3.39MWp Solar Power Plant (Phase II) is expected to be commissioned within next 15 days. Moving towards a greener planet, the Group aims to use renewable and clean energy for reducing carbon emission.
The power generated from this Solar Power Project shall be consumed captively in manufacturing facilities located at Budhni, Madhya Pradesh resulting in considerable savings for the Company.